WeBlow Quoting System
Admin > Rates

       
Revision Date:
Revision No:
 
Charge Out Rates
Item     Non-Union Union  
Blower p/hour: $
Sand p/hour: $  
Slinger p/hour: $  
Slinger Loading Blower p/hour: $  
 
SLA and Accommodation: $  
Additional Crew Member: $  
Slinger Induction Surcharge: $  
 
Setup Costs
0   
1   
2   
3   
4   
 
Costs
Blower p/hour: $  
Sand p/hour: $  
Slinger p/hour: $  
Slinger Loading p/hour: $  
 
SLA and Accommodation: $  
Operations Manager: $  
Project Manager: $  
Team Leader: $  
Team Assistant: $  
 
Accounting
Load and Blow Factor:    
Target G.P. (Supply) %    
Target G.P. (L.T.I.) %    
 
Products - Supply
  Sell Price Cost  
Product Trade Council Domestic Education Load from Yard Delivered Price Variance
PB6-10
PB12-20
MULTI BARK
12mm & 20mm coloured Recycled Timber
WB Bark Blend
WB Bush
EUCEY MULCH
PINE CHIP
COTTAGE MULCH
SOFTFALL
WeBlow Bush Blend
WB 20 TIMBER MULCH
WB 12 TIMBER MULCH
Red Chip and Cedar Chip
WE BLOW Turf and Garden
WeBlow Premium Planter MIx
WeBlow B Soil
Eco Mantle (compost)
WE BLOW BASE/TOP with 20% hydrocell delivered (Burdetts)
WE BLOW BASE/TOP MIX with 40% Hydrocells (Burdetts)
Pea Gravel (tonne)
SCORIA 14MM
SCORIA 20MM
SCORIA 5-7mm
AGGREGATE 14mm Blue Metal (tonne)
14-20mm Crushed Rock (tonne)
WASHED SAND (Wet for slinging) (tonne)
WASHED SAND (Dry for blowing) (tonne)
Medium Washed Sand (tonne)
 
Products - L.T.I.
  Sell Price Cost
Product Trade Council Cost
Mulch
Soil
Scoria
Planted
Not Planted
Maximum
Union
Non-Union