WeBlow Quoting System
Quote
Job Number:
Customer Name:
Category:
Is the site planted?
Yes
Loading from?
Delivered
Load and Blow?
Yes
Float Loader:
Setup Cost?
$
Union Site:
Yes
Accom/Travel Expenses:
Yes
No of nights away?:
Project Manager Required?:
Yes
Time of day?:
Product 1
Product:
Machine Type:
Quantity:
m³
Hose length:
m
Crew:
Hours:
Is slinger loading blower?:
Yes
Materials:
$
Crew:
$
Machinery:
$
Product 2
Product:
Machine Type:
Quantity:
m³
Hose length:
m
Crew:
Hours:
Is slinger loading blower?:
Yes
Materials:
$
Crew:
$
Machinery:
$
Product 3
Product:
Machine Type:
Quantity:
m³
Hose length:
m
Crew:
Hours:
Is slinger loading blower?:
Yes
Materials:
$
Crew:
$
Machinery:
$
Summary
Product 1 ()
Materials:
$
Crew:
$
Machinery:
$
Subtotal:
$
Cost per m³:
$
Product 1 G.P:
0.00%
Ideal $p/m³:
$ 0.00
Ideal Subtotal:
$ 0.00
Product 2 ()
Materials:
$
Crew:
$
Machinery:
$
Subtotal:
$
Cost per m³:
$
Product 2 G.P:
0.00%
Ideal $p/m³:
$ 0.00
Ideal Subtotal:
$ 0.00
Product 3 ()
Materials:
$
Crew:
$
Machinery:
$
Subtotal:
$
Cost per m³:
$
Product 3 G.P:
0.00%
Ideal $p/m³:
$ 0.00
Ideal Subtotal:
$ 0.00
Total:
$
Setup:
$
Prod1:
m³ @ $0.00p/m³ = $0.00
Prod2:
m³ @ $0.00p/m³ = $0.00
Prod3:
m³ @ $0.00p/m³ = $0.00
Float:
- cost needs to be added
Accom:
0 crew for nights = $