WeBlow Quoting System
Quote

  Job Number:  
 
  Customer Name:  
  Category:  
  Is the site planted? Yes  
  Loading from? Delivered  
  Load and Blow? Yes  
  Float Loader:  
  Setup Cost? $  
  Union Site: Yes  
  Accom/Travel Expenses: Yes  
  No of nights away?:  
  Project Manager Required?: Yes  
 
  Time of day?:  
 

Product 1

  Product:  
  Machine Type:  
  Quantity:  
  Hose length: m  
  Crew:  
  Job duration: hours over days  
  Is slinger loading blower?: Yes. hours
  Does slinger require induction?: Yes
 
  Materials: $
  Crew: $
  Machinery: $

Product 2

  Product:  
  Machine Type:  
  Quantity:  
  Hose length: m  
  Crew:  
  Job duration: hours over days  
  Is slinger loading blower?: Yes. hours
  Does slinger require induction?: Yes
 
  Materials: $
  Crew: $
  Machinery: $

Product 3

  Product:  
  Machine Type:  
  Quantity:  
  Hose length: m  
  Crew:  
  Job duration: hours over days  
  Is slinger loading blower?: Yes. hours
  Does slinger require induction?: Yes
 
  Materials: $
  Crew: $
  Machinery: $
 

Summary

Product 1 ()
  Materials: $  
  Crew: $  
  Machinery: $  
  Subtotal: $  
  Sell Price (m³): $  
  Bare min price (m³):  
 
Product 2 ()
  Materials: $  
  Crew: $  
  Machinery: $  
  Subtotal: $  
  Sell price (m³): $  
  Bare min price (m³):
 
Product 3 ()
  Materials: $  
  Crew: $  
  Machinery: $  
  Subtotal: $  
  Sell price (m³): $  
  Bare min price (m³):
  Ideal Subtotal: $ 0.00  
 
  Total: $  
Setup: $
Prod1: m³ @ $0.00p/m³ = $0.00
Prod2: m³ @ $0.00p/m³ = $0.00
Prod3: m³ @ $0.00p/m³ = $0.00
Float: - cost needs to be added
Accom: 0 crew for nights = $